Frame houses do it yourself step by step instructions

  Frame houses do it yourself step by step instructions

Installation of the roof of a frame house is a very important event. Rafters (pictured) of the roof can be done both before and after wall cladding. I did the first trim, but often do the rafters before the trim (especially the Finns, who on the roof very quickly put the farm from the factory)

I delegated this stage, I could not master it myself, very heavy boards for rafters, you have to drag it to the very top and do everything very precisely.

Frame-shield house with their own hands. Wall cladding

Before sheathe the walls, you need to check their slope vertically. It is better to sew up the walls completely, and then cut the openings in the casing, so tight.

Usually the walls are sheathed with OSB, but I do not like this stove, it does not let off steam. It is better then to use the MVDP Beltermo or inch (as in my photo).

How to build a frame house. Selection and installation of roofing

Now is the time to cover the roof. We select the material, then choose the right pie roof (depending on the material and the room – it is warm or not). Do not forget that it is often necessary to pre-design the ventilation in order to lay penetrations for the ventilation pipes before the roof closes with the same shingles (with metal, all this can be done later).

Wooden Canadian house with his own hands. We tighten walls with a hydro windproof membrane

Before installing windows, it is better to sew the walls outside with a waterproof windproof film. At the same time, we protect the OSB from moisture.

Additional information and film instructions:
Films and membranes in the skeleton
Crate in the frame house

Windows and doors in the frame house

Installation of windows is better to do before the facade materials and insulation. So that later there were no problems with the design of slopes and wet insulation. Doors and windows can be taken as with the installation (expensive, but give a guarantee), or install it yourself (budget, but hard). Large windows from 2 sq.m. Better to put on pins on the concrete, small can be put on the plate. Do not forget about the professional foam, plastic special spacers, as well as the use of films (for the formation of a closed loop vapor and waterproofing.

Facade of a frame house with your own hands

The sooner we make the facade, the faster our designs will be protected from moisture, and the film from the sun’s rays (from which it gradually loses its properties).

Almost all the facades in the correct wooden house are made with a ventilation gap, so do not forget to buy a dry crate (buy 100 × 25 and cut along, as well as 50 × 50 – in the case of an option with external insulation to the ventilation gap).

Frame house do it yourself. Communications

Before insulation, it is better to conduct basic communications in the house: sewage and water supply. Electrics and heating can be postponed, as they are made either openly or hidden, but in crates (after the main contour of insulation and vapor barrier).

The bathrooms of our frame-shield house – a separate topic:

  • bathroom floors should be well waterproofed;
  • the ceiling must be vapor proof;
  • walls must be vapor proof.

Additional information and communication instructions:
Communications in the frame house

Warming a wooden house with their own hands.

Insulated carcasses are usually mineral wool, but ecowool is becoming more and more popular. I, too, will insulate the house with ecowool, it has many advantages: price, lack of gaps in insulation, insulation speed, environmental friendliness (compared to mineral wool), lack of structural elements of a clear step (you can take a step lag at least 300 mm, the same with racks, you can safely put them through 600 mm).

Additional information and instructions for weatherization:

Vapor barrier in the skeleton.

After insulation, but before finishing or additional insulation inside, tighten all walls with an airtight, closed loop vapor barrier. Best of all, 200 micron thick plastic film and special butyl rubber tape are suitable for this.

Additional information and vapor barrier instructions:
Vapor barrier in the frame house

DIY frame: step by step instructions. Electrics and heating

Now is the time to connect electricity from the pole to your electrical panel (it is better to design and assemble it in advance, and before that get permission to connect a specific number of KWat).

After the house is insulated, but before the finishing stage – it’s time to also do heating. We start with the choice of heating fuel (wood, gas, electrics, gasoline), boiler, and then the material for heating pipes. Recently, increasingly in a frame house choose warm floors instead of radiators.

The Canadian wooden house is very warm, it needs to be well insulated once, and then you can even heat it with electricity. Of course, spending on electric heating will be 3 times more expensive than gas, but still less than what you pay in the apartment.

Interior finish: step by step instructions

The walls and the ceiling in a frame house are usually trimmed with gypsum plasterboard (plasterboard), and then it is painted or wallpaper glued onto it. GKL is good because it burns badly. In Canada, in general, without a GK, carcasters are forbidden to build according to fire safety requirements. And on our ceiling more and more often they are beating lining or imitation of a bar and painting (I like the particularly white color in this place).

After finishing the walls and ceiling, you can pour the concrete screed, tile the floor or laminate, and then put interior doors. Particularly good Finnish interior doors, many praise them, but the price they are now exorbitant.

Congratulations! Connect plumbing fixtures, arrange furniture and can move in.

Here is an instruction for the construction of a Canadian or Finnish frame house. How do you?

Step-by-step construction instructions for a frame house

Until recently, mainly log houses, brick or concrete, were erected in our country, but now it is time for new technologies, and frame construction has appeared in this segment. It has not yet been mastered at full capacity, so I would like to consider in detail how the construction of the frame house is going on with their own hands with step-by-step instructions contained in the article. The instruction itself consists of 4 steps:

  • foundation installation;
  • frame assembly;
  • walling and thermal insulation work;
  • roofing.

The main advantage of this design lies in the rapid pace of construction without the involvement of special lifting mechanisms. Low-cost frame buildings are put into operation in one season, but such speed in no way impairs comfort and heat preservation, and here such parameters are no worse than those of wooden or stone houses. Now we offer to disassemble all stages of construction separately.

Choosing a place on the site

The use of wooden material suggests the presence of a site without excessive moisture. The site must be well ventilated and dry enough so that the wood does not rot. Drawings from the project documentation must be compiled with reference to the landscape, because only such scruples can guarantee durable operation of the dwelling without problems and major repairs.

It is possible to make a qualitative foundation only after conducting a geological analysis of the soil, while the house is being built according to the calculation of operational loads.

We make a project

The developer must be guided by the project created by experts in this field. Compiled documentation must also be approved by authorized officials of various services, where changes and / or additions may be made. At the initial stage, the step-by-step instruction allows independent sketching, but then you need to select a suitable standard project or make an individual one taking into account personal preferences and wishes, but in that and in the other case it is necessary to mark all communications and add engineering systems to the plan.

An example of a draft typical project

We draw your attention to the fact that typical projects traditionally cost less, and individual projects allow you to realize your own ideas.

Engineering systems

Construction of a frame house, like any residential building, provides for the introduction of all engineering networks into the project. According to the instructions, communications are laid in a certain sequence, and you need to start from the foundation. All technological holes for communication systems need to be made at the time of pouring, so that after solidification of the base it is not necessary to engage in complex drilling.

The electrical system consists of a switchboard, electrical wiring, sockets and grounding. The distance between the points under the sockets should be no more than 4 m. Sockets with lids are installed near the water sources. The ventilation system includes air ducts with openings. Should I remind you that the correct access to and use of taps, switches, as well as the functioning of drains and sewage drainage depends on the correct wiring of pipes and wires?

Foundation installation

The technology of construction of a frame house provides for the installation of shallow strip foundations. columnar or block concrete foundation. Strength basics increase with rebar and monolithic strapping. For the frame construction of a fairly small base, which can easily withstand small loads. The most effective type of foundation for a frame house – screw piles. This foundation does not require a large amount of materials, which reduces the cost of construction estimates.

Variants of the device grillage on screw piles

Under the foundation plate, it is necessary to dig a trench or drill wells for piles, then pour a sand pad. Before you start pouring concrete, you need to make a formwork and install reinforcement rods. Ribbon foundation in the process of pouring necessarily ram. The step-by-step instruction states that for the construction of a frame house, vertical studs half a meter long are installed in the liquid concrete of the foundation every 2 m. The surface of the grillage must be leveled with the same cement mortar.

Lower piping

Seven days after the work on pouring concrete, the bottom trim of wooden bars with a section of 15×15 cm is laid over the entire surface of the base. The wood must be pre-treated with antiseptic agents, and two layers of roofing felt, which perform the role of waterproofing, are laid at the bottom. Timber can be fixed with anchor bolts or foundation studs. If bolts are used, then under them you need to drill technological holes up to 10 cm in depth. The length and in the corners of the connection is arranged and fixed with nails.

Bottom trim house

When all wooden bars are laid and connected with each other and with the foundation, grooves are formed in them and floor logs are placed (50×150 mm board). The upper part of the lag is aligned horizontally, and the bars are nailed to the bottom, which will serve as the basis for the installation of the subfloor, to which the membrane vapor barrier material is stitched. In between the lags, you need to press the heater (mineral wool or foam). A trim board (40×15 mm) is laid on top.

Floor layout

Now you can go through the following stages, which will be discussed further.

Create a frame

Mounting the frame house with their own hands, the developers from the very name of the technology understand that the main element of such a structure is the frame, and it is on it that the entire structure is retained. The skeleton consists of vertical posts fixed with bolts and horizontal strapping. As before, here the entire construction process is carried out in stages. The material used is wood or metal profile. for the installation of which will require a welding machine and certain skills. If you decide to create a frame of wood, it is recommended to choose hardwoods, such as larch or the most popular oak. The height of the rack should correspond to the same parameter of the room. Connect the rack thorn-groove on the principle of lower strapping. After fitting, there should be no gaps.

Wall frame elements

Depending on what kind of load will affect the load-bearing supports, plan the distance between the uprights and their caliber, and the dimensions of the cladding material are already selected for them. Typically, the cross-section of the racks take 150×50 mm, in the openings put a double beam 150x50mm. The most popular step racks – 600 mm (allows you to install insulation “in the tension” for dense filling the wall). To connect the uprights with the lower strapping, temporary braces are used, which is why the structure acquires the necessary rigidity.

Diagram of the device corners frame

Now the step-by-step instruction led us to the installation of the top trim, which is carried out after the installation of the vertical beam. Fixing occurs with the help of the same grooves, which fastened the lower timber. The upper fastening to the posts is carried out by two nails, which should enter the material not less than 10 cm. The final fastening of the frame is carried out by permanent mowing, installed instead of the dismantled temporary. Read more about this in the article “Upper and lower trim of a frame house.” We also recommend that you familiarize yourself with the most important components of a frame house.

We install and insulate walls

The outer walls of the house are sheathed with a siding under a log, wooden lining, plastic siding, as the owner of the house wishes. Warming is best done using mineral wool. It will reliably and inexpensively solve the problem of home insulation, which makes frame construction even more profitable and in demand. If you plan to live here all year round, then select insulation with a thickness of 15 cm or more. For greater efficiency, tackle the counter lattice from a 50×50 mm (8) bar and put insulation (7) with the “second layer” on top of the racks so that you can avoid possible cold bridges and make the house truly energy efficient. Read more about the pie wall device. and also about the general warming of the frame house.

Scheme of warming of a frame wall

The material is pressed into all the gaps between the beams to remove voids. To protect the wood from moisture, a waterproofing film will help, which is mounted on top of the insulation on the racks, and only then the lath casing for ventfacade, which will be hidden under the external facing, is packed. An OSB or gypsum fiber board is suitable for wall cladding from the inside.

Building a ceiling

The ceiling is attached to the ceiling beams, which, in turn, are fixed with grooves or steel brackets on the top trim bar. Where interroom partitions are installed, it is necessary to install support bars in the place of which a wooden ceiling shield is nailed.

Warming attic flooring scheme

On top of the shield you need to put a vapor barrier membrane with an obligatory overlap on the beams, with which the mineral wool, foam plastic, etc., are laid level with. The insulation is closed by vapor barrier, and boards are laid over it. Read more about weatherization attic.

So in stages we got to the installation of the roof. The roof weighs a lot, so it must rely on the finished walls without finishing. Before proceeding to work, determine the degree of slope, the number of ramps, the type of roof cladding, the design of the truss system.

The dependence of the slope of the roof of the material used

A roof with a complex shape looks attractive, but it is difficult to implement, therefore, not cheap. Most often there are two-fold constructions. allowing to equip the attic or attic space. Here it is necessary to install only one ridge, endy and completely absent, which eliminates the accumulation of precipitation and leakage. So that the snow did not stay on the roof, plan its slope more than 28º but not more than 50º, otherwise the wind load will increase.

The cross section of the rafters is determined according to the placement of insulation material between them, an average of 100-150 mm. It is best to take a board, caliber 150x50mm and 6 m long. Two boards need to be knocked down in the shape of an L, and then they are lifted up and the angle is determined, ensuring that the overhangs extend beyond the wall level by 30-50 cm. Now the boards can be assembled with a bolt, and we get a kind of rafters.

The design of the truss system gable roof

Where there will be supports, triangular notches are provided for a third of the height. The upper frame binding acts here as a mauerlat. According to the made sample, they create rafters on the entire roof, not forgetting about a step of 700 – 800 mm. Rafters on a skate set to the gable, and already on them continue to install the remaining elements. Depends on what decorative lining will be.

Roofing material

Step-by-step instruction ends at the stage of installing the roof cladding. You can choose a soft tile, corrugated board or metal tile. It is easy to work with all these materials, they are affordable and have a decent look. After facing, it will only be necessary to install drainpipes and a drainage system, which will be responsible for the removal of precipitation outside the site.

But for you a unique film – a detailed step-by-step instruction on the construction of a frame house from scratch. Do not thank!)

Now you know how to build a frame house with your own hands so that the structure is strong and warm. If you do not ignore the rules of construction and assembly technology, you will become the happy owner of your own home, which you can only dream of.

Frame house do it yourself. Step-by-step instruction of construction stages

Due to a number of advantages, frame and modular houses confidently lead in the rating of prefabricated structures, suitable not only for country use, but also for permanent residence. Light, not requiring a massive foundation, with high thermal protection, such constructions are not inferior to brick or block houses. In addition, there is always the opportunity to build a frame house with your own hands. Step-by-step instructions will help you understand the main stages of construction.

Competent project – a pledge of comfortable living conditions in the frame house

Frame house do it yourself. Step by Step Construction Instructions

The most affordable and fast construction technology is the construction of a frame house for permanent residence. Therefore, frame houses all over the world are so popular. Construction of the frame house 6×6 with their own hands, starting with the foundation and finishing with finishing works, can be carried out by a brigade of three people within two months.

Construction begins with the development of a competent project. You can build a frame house with your own hands, but it is better to entrust the project to professional designers. It should reflect the constructive, architectural, engineering, engineering sections and schemes of the frame house. It will be easy to embody engineering ideas with your own hands, strictly following all instructions.

Frame construction are becoming increasingly popular in the field of home construction

Photos of frame houses, the projects of which are developed by design organizations, clearly demonstrate the level of professionalism of designers. The network offers a lot of videos on how to build a frame house with his own hands.

Preparation and marking of the site under construction

Starting to build a frame house with their own hands, begin preparing the site for construction. For a qualitative marking the site is free from trees, bushes, grass, stones and debris. If the plot contains slope or unevenness in its relief, it is recommended to level it. All heights are cut to the required level, the ground is poured into the grooves.

Layout plot for the foundation

Starting the construction of a frame house with their own hands from scratch, produce marking for the foundation. To transfer data from the project to nature, it is necessary to mark the external dimensions of the house with the help of wooden pegs, as well as to outline the internal walls. All marking angles must be strictly maintained, since the future of the structure depends on it.

How to build a frame house with your own hands? For familiarization with the construction technology, it is recommended to watch a video lesson.

Video: do-it-yourself frame houses, step by step instructions

Laying the foundation of a frame house: instructions

The process of phased construction of a frame house with their own hands begins with the construction of the foundation. Given the ease of construction being constructed, there is no need to lay a massive foundation under it. For the foundation of a frame house with their own hands, they use columnar, tape (shallow-depth, prefabricated, monolithic), pile and other types of light foundations.

In our case, we take the basement foundation. This is a system of pillars installed in the corners of the future house, at the intersection of partitions and in other bearing points. The pillars are located around the perimeter at a distance of 2-2.5 m from each other. To do this, first arranged a shallow pit and sand pillow. When the foundation pit is ready, check the correctness of the marking with the diagonal method.

3D diagram of the arrangement of the column foundation

With the help of a drilling rig (motobura) or shovels dig holes for the columnar foundation. The formwork is installed, waterproofing is being laid and brick pillars are arranged. For waterproofing, you can use roofing felt or film.

If the posts are made of concrete or cement, reinforcement should be used. It can be equipped by strengthening the pillars on all sides with iron bars 12 mm in diameter. The reinforcement bars should protrude 15 cm above the post – this will ensure the subsequent bundle of posts with the grillage. Reinforcement is horizontal and vertical. Horizontal wire jumpers (wire diameter of 6 mm will fit) are placed at a distance of 20 cm.

Pillar foundation with concrete grillage

The framework of the grillage is made of rods tied with steel wire. Formwork is collected from the boards, the dimensions of which must correspond to the parameters of the trench. Next, proceed to pouring the concrete solution, which is kneaded independently or acquire the finished mixture. Concreting is done in stages, each time stamping the mixture. At the end of the work, 50-cm long pins are inserted into the foundation, onto which the skeleton of the wooden frame house will be attached.

Acquainted with the work on the construction of the foundation can be from the video “How to build a frame house with your own hands.”

Binding of the base of the frame house: step by step instructions

After the foundation work has been completed, it takes at least a week for the concrete to set properly. Next, equip the waterproofing of the foundation of roofing material or waterproofing, laying it in two layers. The trim is made of timber section 150×150 cm

Helpful advice! When choosing a bar for the lower trim, take into account the distance between the supports of the columnar foundation. The larger it is, the thicker the timber should be. This will help avoid sagging.

The prepared timber is laid on the foundation around the perimeter, control the length of the walls, checking the data with the project. If the length of the beam is not enough for laying on one side of the perimeter, it is necessary to join them to each other. The timber is cut and joined so that the docking places fall on the foundation pillars. Docking is done by cutting locks at the ends of the bar (the inlet is 30 cm). In the corners of the uneven bars are connected by the same principle.

Frame house can be built in two months

Next, fix the timber to the foundation with studs or bolts. Drill holes in the timber and in the cap of the foundation. Speakers attachment points as possible deepen. The joints are fixed with nails. The foundation binding under the internal partitions is performed in the same way. For reliability it is recommended to fix the joints with metal corners.

Visually familiarize yourself with the implementation of tying the foundation can be from the video “Frame houses with your own hands.”

Device flooring frame house do it yourself: step by step instructions

Installation of the floor begins with fixing the log to the bars of the finished trim. A log with a cross section of 10×20 cm can be used as a log. In this role, the board can also act, but then it is necessary to install two boards together for rigidity. The frequency of the location of the lag is calculated taking into account the size of insulation plates, which should fit tightly between the lags. For example, if mineral wool with a 61 mm wide sheet will be used for insulation, the lagging pitch is set to 60 cm.

For fixing the log, nails and fixing angles are used. The lags do not fit flush with the timber, but retreating from the edge of the timber about 5 cm, where the boards covering the gap between the lags will then be attached. When all the logs are mounted, one or two transverse boards are nailed between them to make the structure rigid.

The scheme of arrangement of the floor frame house

The next step will be laying on the crate floor membrane waterproofing material, which is covered with the entire surface of the floor frame. On top of the membrane stack plate insulation. Insulation is positioned so that the butt line of the plates of the previous layer is closed with the middle of the plate of the next layer.

Helpful advice! For high-quality paro-and waterproofing appropriate material is recommended to overlap in order to avoid moisture or steam.

A vapor barrier film is laid on top of the insulation and only after that the floor is covered with special slabs. In addition to the plates, you can use plywood or board.

Lathing of the wooden frame of the house on a pile foundation

Numerous photos of the frame house with your hands with a phased fixation of work will help to understand the installation in detail.

The device walls of the frame house

The installation of the walls of a wooden frame house is done by assembling the frame structure. It can be wooden or metal. Oak is most often used for wooden frames, but other wood species can also be used. The frame is assembled according to the construction scheme of the frame house. With his own hands, a wall span first collects on the floor, and then the finished wall element is mounted to the floor.

Arrangement of a floor and walls of the frame house

At this stage, it is important to correctly make all measurements and calculations of the length and height of future walls. The distance between the racks is made on the basis of the width of the insulation plates, so that they clearly enter between the racks. In the case of using mineral wool as a heater, the step is made 1-2 cm less than the width of the material. All vertical racks are nailed to the top and bottom frame member. For reliability, you can also use mounting angles.

When calculating the length of each wall, it is necessary to take into account that each span must be less than the thickness of the rack of the next span. Sometimes the length of the timber is not enough to cover the entire wall. In this case, the span walls form of several parts, which are subsequently connected to each other. The span of the wall, assembled from several parts, is easier to mount if the work is performed by one person.

Elements of construction of the frame house wall

To make the framework of the walls more rigid, jumpers are installed between the vertical posts. They, as a rule, are mounted in a staggered manner: in one space from above, in the other – from below. Lintels can be mounted both on the installed frame, and when the structure is still on the floor. Window and doorways in the frames of the walls are arranged according to the project.

When all the spans of the walls are ready, proceed to their assembly. The first span is mounted to the floor, and supports are installed outside. So alternately collect all the walls, connecting them together with nails. When joining parts of the walls of a single span, it is monitored to match the bottom and top of the structure. To fix the vertical level of the wall, use sticks (diagonally nailed boards).

Installation of walls of the frame house

Helpful advice! To control the verticality of the pillars and the correctness of the corners, use a long level or plumb and a construction square.

To get acquainted in detail with how the frame house is made with your own hands, use photo and video materials on this subject.

Installation of internal partitions and ceiling

When the outer walls are mounted, proceed to the installation of internal partitions. The principle of assembly of internal walls is no different from the installation of main walls, except that their thickness may be somewhat less. As for the heat-insulating layer, here it is used as sound insulation. In addition, the device of such walls does not provide for steam and waterproofing.

Reliable fixation of the frame elements will ensure the strength of the entire structure of the house

Next is the binding of the entire structure on the upper edge. This will contribute to the rigidity of the entire assembled structure and high-quality fixation of all angles. The top trim is made of planks, which are nailed from above along the entire length of the external and internal walls. The important point here is that the connecting lines of the parts of the walls should be covered with a solid board not less than 30 cm.

After that, the surface of all the walls with the outer or inner side is sewn osb-plates. This will give the final rigidity of the whole structure of the wall framework.

The arrangement of the attic in the frame house

The ceiling is mounted on the timber top trim. For this purpose, grooves are made into the timber, into which the ceiling beams are inserted, additionally fastened with nails. In the place where the internal partitions pass, the support bars are mounted, which are connected to the lower and upper trim. Nail ceiling shield, made of grooved boards.

The vapor barrier layer is laid on top of the shield, they are covered with an overlap ceiling beams. Next, flush with the beams laid out the material of thermal insulation (mineral wool, foam, expanded clay). A layer of insulation is covered with a waterproofing film and a board of boards is laid in the direction transverse to the beams. Next is going to the floor, as on the lower floor.

Ceiling arrangement with hydro and vapor insulation, as well as with the use of mineral wool as a heater and sound insulation

As an additional help, use a photo of the construction stages of a frame house with your own hands.

Roof structure

The roof is arranged at the stage when all the walls are built and fixed. Determined by the desired slope and the number of roof slopes. The most common is the gable roof. To increase the usable area, some houses are equipped with a veranda. The project of a frame house with a veranda can provide for two types of roof structure: above the house, a gable, above the veranda, a single slope. These types of roofs are also used for the frame house with an attic and a veranda. For single-storey frame houses with a flat roof, only one-sided construction is used.

Gable design – a popular solution for arranging the roof of a frame house

Rafters are selected with a cross section so that insulation can be laid between them. For the sample, take two boards with a length of 6 m and connect them into an L-shaped structure, lift them onto the roof, rest on the trimming beam so that the overhangs are 35-50 cm. The resulting design is fixed with a transom and used as a model for the rafters. They are mounted at a distance of 70 cm from each other.

The connection of rafters in the ridge is carried out according to the method of “half paws”. The first rafters are installed on the gables, and then a thread is drawn between them, according to the level of which the remaining intermediate rafters are mounted. Next, arrange crate: thinned or solid.

Helpful advice! Whatever the crate, its installation in the skate area should be performed without a gap.

The frame of the house is sheathed with OSB-plates from the outside

For roofing, you can use metal tile or profiled sheeting. This material is easy to install, has low weight and affordable price. In addition, such a roof will always have an attractive appearance.

You can learn more about the roof construction technique by searching the video “How the frame house is built” on the network.

The device for warming a frame house with your own hands: a step by step instruction

To know how to warm the frame house, you need to focus on the seasonality of living in the house. If it is planned to live permanently, then the heat insulating layer should be at least 5 cm thick. For arranging the warming of a frame house with their own hands, they use expanded polystyrene, foam or mineral wool.

The distance between the uprights of the frame should be slightly less than the width of the insulation

From the outside, the OSB slabs are covered with a waterproofing membrane. After that the lattice from rails for ventilation in the frame house is stuffed. With his hands on the inside between the vertical racks fits the necessary layer of insulation. Each subsequent layer of insulation should overlap the junction of the previous layer. To avoid moisture ingress from inside the room, a vapor barrier is filled over the insulation and the walls are sheathed with sheets of osb-plates.

Insulation for the walls of the house outside the siding: choose the material and method of installation. The choice of the type of insulation. Features of materials, their advantages and disadvantages. The main stages of installation.

Next, make the exterior of the house. This may be plaster, wall cladding wagon board or siding. The most acceptable finish is vinyl siding. as it is easily mounted and is able to protect walls from external atmospheric phenomena for a long time.

Siding lining – a good solution for finishing the frame house

The main advantages of frame houses

The construction of frame houses (reviews confirm this) solves the problem of obtaining comfortable and budget housing. The advantages of this technology:

  • the most affordable construction technology;
  • the ability to use lightweight foundation types;
  • fast erection speed;
  • sufficiently low thermal conductivity of the structure allows to reduce heating costs;
  • low heat capacity allows you to quickly warm up the house to a comfortable temperature in the event of intermittent use of housing;
  • excellent sound insulation;
  • the possibility of placing communications inside the walls, which has a positive effect on the aesthetic component of the premises;

Sample arrangement of frame house – a sectional view

  • Lack of shrinkage allows you to start finishing work immediately after the construction of the house and move into it in the shortest possible time;
  • use in the construction of environmentally friendly materials;
  • high seismic resistance (up to 9 points);
  • no need to heat the house in winter in the case of seasonal residence;
  • no need to use special construction equipment;
  • the absence of wet construction cycles makes it possible to work regardless of air temperature and water availability;
  • quick disassembly if necessary.

Prefabricated frame house with modern building materials

All these advantages contribute to the increasing popularity of frame technologies among the methods of construction of residential buildings. In addition, such technologies allow owners of small-sized houses to build a frame extension to the house with their own hands to increase living space. Such constructions are economical and, with proper construction, provide conditions for comfortable living. They are minimal in cost and can be added to any type of home.