Day: November 8, 2018

How to make an extension to the house of the timber

Legitimation of the annex should start with the local architectural authorities. To do this, you must submit drawings and a construction plan there. We will have to pay a state fee. When legitimizing the already built premises, the owner will have to pay a rather serious fine for the lack of timely executed documents.

  How to make an extension to the house of the timber

If the owner is not a professional builder, it makes sense to hire a team of specialists to build an extension. They will take into account all the nuances of such an event, gather the necessary permits and buy building materials at the best prices.

More articles on this topic:

How to make an extension to the wooden house with your own hands?

  • Construction of the extension to the house from the frame

  • Contribute a better translation

  • Comfortable frame sauna with your own hands: step by step instructions

    (more…)

  • DIY Slate Roof

    4. Installation is made from the bottom up, taking into account the direction of the prevailing winds so that in places of overlap the slate is blown as little as possible. For marking along the rows of stretched cord. Begin laying on the right.

      DIY Slate Roof

    When laying should take into account the direction of the prevailing winds

    Important! If you carefully consider the sheet of slate, you can see that the height of the waves in it is different. On one side of the sheet (overlapping) it is higher than on the other. This is done so that the slate does not bristle overlap. At installation it is necessary to take into account this difference.

    5. When calculating the amount of slate should take into account the size of the overlap (overlap) sheets. which is 1 or 2 waves. Overlapping sheets in adjacent rows – 12-20 cm. (more…)

    Build a house yourself where to start

    Now we understand what can affect the value of the house in one direction or another.

    • The complex shape of the house and the presence of the decor on the facade.
    • Balconies and basement.
    • The abundance of small rooms.
    • Constructions of irregular shape, second light in the rooms, high ceilings.
    • Roof with a fancy shape or a corner too sharp.
    • Replacing the second floor attic.
    • The house has a simple square shape, a smooth facade without protrusions and grooves.
    • A large number of windows.
    • Minimum internal partitions.

    To make it easier to make calculations, we will list the stages of the construction of a house, and what part of the total budget should be allocated to each of them.

    • The zero cycle will require 15% of finance. It includes pouring the foundation (if necessary). The walls are built no earlier than a month after that. When building is preserved for the winter, the foundation is laid.
    • 35% of the estimate take the work of general construction purposes. They include the installation of the roof and the laying of the walls, both interior and exterior. This is done to ensure that the load on the base is uniform. This stage must be completed before the winter cold.
    • The next 15% of the funds will take away the installation of windows and doors, as well as the insulation of the house.
    • Another 15% will take on communication. Pipes, plumbing fixtures, boiler check after installation.
    • The remaining 20% ​​estimates belong to the interior decoration. It is not necessary to hurry with her – inside an insulated house you can work for as long as you wish.

    (more…)

    Inexpensive foundation do-it-yourself

    On non-heaving or weakly heaving soils for a private house, a shallowly recessed foundation is arranged. For these conditions, it is sufficient to perform horizontal reinforcement of the masonry rows.

      Inexpensive foundation do-it-yourself

    Foundation construction from masonry materials on poorly heaving and frost-protected soils: 1 – foundation laying; 2 – masonry base; 3 – blind area; 4 – horizontal waterproofing; 5 – filling the floor on the ground; 6 – reinforcing masonry mesh every 20 cm masonry;

    Masonry foundation reinforced masonry mesh with a wire diameter of 4-5 mm. and cell size 100x100mm. The width of the base of the foundation (size B in the figure) is calculated on the basis of the bearing properties of the soil and the weight of the building — find out here.

    The width of the basement footing for a house with light wood walls, or frame walls, for most poorly heaving soils is usually sufficient in the range of 20 to 40 cm. (The larger size refers to three-story buildings). (more…)

    Home insulation foam technology

      Home insulation foam technology

    Ideally, the fastener will be carried out not only with glue, but also with umbrella-type dowels. So you can hope that the foam will be excellent hold.

    We carry out the work according to the following algorithm:

    • Attach the starting profile along the bottom edge of the wall. It will be additional support and will save sheets of polyfoam from their slipping.
  • A glue mixture is applied around the entire perimeter of the insulation. Particular attention is paid to the middle. Now the sheet is pressed against the wall surface and held for several seconds. You can skip to the next item.
  • After this, the warmed surface is allowed to stand for at least 3 days for complete drying. This time is usually enough to glue the foam over the entire house, and the glue has managed to grasp securely.
  • Now it’s time to fix the foam for the facade with umbrella construction dowels. (more…)